Skip to content

Commercial and Industrial Floor Coatings in Riverside, CA

Riverside Epoxy Flooring Group is Riverside County's commercial floor coating contractor, working with facility managers, property managers, building owners and general contractors on retail showroom floors, clinic and lab suites, and light-industrial production areas. We handle projects from a single 1,000 sq ft showroom section to multi-section floors of 3,600 sq ft and more, priced and phased one section at a time.

Request a bid or a site walk

A Resin Floor Contractor for Facility Buyers

Our crews work occupied stores, dental suites, schools and plants, phasing each section around business hours, patients and shifts so doors stay open and production keeps moving. Backed by 12 years in business, we have completed over 1,187 projects, and facility references are available on request, from one-room tenant suites to multi-bay industrial floors.

From the slab survey, moisture test and sample area to the punch walk and closeout binder, our team handles the parts of a commercial floor job that decide whether it finishes on schedule. Serving Riverside, Eastvale, Norco and Diamond Bar, we hold the GC's schedule, work nights and weekends where the building requires it, and turn each section over ready for punch and inspection.

Request a bid: send the plans, square footage and shutdown windows.

What you can hold us to

The Crew Behind Every Floor

12 yearsGrinding and coating slabs across the Inland Empire and Orange County
1,187Garage, home, shop and commercial floors completed
2-year2-year workmanship warranty against peeling, delamination and hot-tire pickup
45 milesFrom Riverside out to Villa Park, Claremont and San Antonio Heights

Matching the Resin System to Your Sector

The sector picks the system, because sanitation rules, chemicals, wheels and slip risk differ more between buildings than colors do. A dental suite in Diamond Bar and a pick and pack zone in Eastvale both get a resin floor, but one needs a coved seamless surface and the other a thick build for forklifts.

SectorWhat the floor has to surviveSystem we usually specifySector page
Warehouses and distributionSolid forklift tires, joint spalls, concrete dustHigh-build 100% solids epoxy, safety-yellow aisle stripingwarehouse and distribution floors
Manufacturing and assemblyHydraulic oil, dropped parts, process chemicalsHigh-build epoxy, aluminum oxide grit, safety stripingproduction floor coatings
Food and beverage plantsHot washdowns, sanitizer, freezer cyclingUrethane cement slurry, integral cove, broadcast textureurethane cement for food plants
Dealerships and repair shopsHot tires, brake fluid, lifts and jacksHigh-build epoxy, gray quartz broadcast, chemical-resistant topcoatservice bay and showroom floors
Restaurants and kitchensGrease, hot water, a wet dish pitUrethane cement slurry, integral cove, quartz texturerestaurant kitchen floors
Medical, dental and clinic suitesDisinfectants, rolling chairs, seams that hold grimeSeamless epoxy with integral cove base, light gray, antimicrobial-ready topcoatclinic and dental floors
Retail showrooms and officesDaily foot traffic, carts, a floor that sellsHigh-build epoxy, quartz broadcast, polyaspartic topcoatCovered on this page

Commercial Floor Specifications We Write Into Every Bid

Surface prep
Mechanical diamond grinding to a CSP 2 to CSP 3 profile on every floor, never acid etching
Dry film thickness
15 to 35 mils on a multi-coat flake system, 40 to 120 mils on high-build and self-leveling floors
Basecoat solids
80% to 100% solids by volume, so the coat does not shrink thin as it cures
Topcoat
UV-stable aliphatic polyaspartic clear coat that will not amber in the sun through an open garage door
Moisture testing
Every slab tested; above 3 lbs per 1,000 sq ft per 24 hours it gets a moisture-mitigating epoxy primer
Hot-tire resistance
Rated for tire contact heat from 140°F to 180°F
Slip resistance
0.60 to 0.85 DCOF with aluminum oxide or polymer grit in the clear coat
Hardness
75 to 85 Shore D, so a dropped wrench or a jack stand does not gouge it
Compressive strength
8,000 to 12,000 PSI, well above the 3,000 to 4,000 PSI of the slab underneath
VOC content
0 to 50 g/L, inside South Coast AQMD limits
Walk-on time
4 to 8 hours on polyaspartic, 18 to 24 hours on 100% solids epoxy
Park-on time
24 to 36 hours on polyaspartic, 72 to 96 hours on 100% solids epoxy

Surveying the Slab Before Any Number Means Anything

A slab survey and moisture test come first, on a Norco shop slab or a Villa Park office alike, because a price written before anyone reads the concrete is a guess. We map cracks, spalls and oil-soaked areas, then test moisture by ASTM F1869 calcium chloride or ASTM F2170 RH probes, as the product data sheet requires.

Any reading above 3 lbs per 1,000 sq ft over a typical 24 hours gets a moisture-mitigating epoxy primer in the bid, because vapor pushing up through the slab is what blisters a commercial floor in its first summer. Hot, dry summers hide that until the floor is sealed, so older buildings in North Tustin, El Sobrante and near Downtown get tested in more than one spot.

Commercial Floor Coating Cost and How the Bid Is Built

Commercial or multi-car facility floor

Est. investment
$5,500 to $14,000 per section (1,000 to 2,000 sq ft)
Est. duration
3 to 5 days

Phased by section, high-build epoxy or quartz, cove and striping as needed

Old coating removal by diamond grinding

Est. investment
$800 to $3,000 per floor (400 to 600 sq ft)
Est. duration
4 to 8 hours

Failed DIY paint or peeling epoxy ground off before the new system

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Commercial floors in Riverside are typically budgeted per section, with an estimated $5,500 to $14,000 for each 1,000 to 2,000 sq ft section of a commercial or multi-car facility floor, and slab condition, system thickness and phasing move the number most. Each section typically takes an estimated 3 to 5 days on site, so phasing is a calendar question as much as a price one.

Bid lineEst. investmentEst. time on site
Commercial or multi-car facility floor, per 1,000 to 2,000 sq ft sectionEst. $5,500 to $14,000Est. 3 to 5 days
Two-section production or storage zone, about 3,400 sq ftEst. $13,500 to $24,000Est. 3 to 5 days
Old coating removal by diamond grinding, inside the floor jobEst. $800 to $3,000 per 400 to 600 sq ftEst. 4 to 8 hours

Bids for Woodcrest shops and San Antonio Heights offices are built the same way, line by line: square footage by zone, the system and its mil thickness, joint and crack repair, moisture mitigation where the test calls for it, cove base, drains and striping, then the phasing plan with any night or weekend shifts.

These figures are budgetary estimates for Riverside and are subject to change. Your written quote, confirmed on bid from the plans, the specifications and the slab survey, sets the final price and the install schedule, and it depends on the moisture readings, the system specified and how many phases the building needs.

Commercial Project: A Retail Showroom in the Wood Streets

Retail showroom floor coated in light gray quartz epoxy with a satin finish, glass storefront and back office door beyond

Angela, Wood Streets, Riverside

Commercial and Industrial Floor Coatings

Material
high-build epoxy, quartz broadcast, polyaspartic topcoat
Size
showroom and back office, about 1,600 sq ft
Est. investment
$8,800 to $12,400
Est. duration
3 to 5 days

A retail showroom on worn carpet tiles over an old slab, open six days a week

Investment and duration figures are estimates. Your written quote sets the final price and schedule.

Angela's retail showroom in the Wood Streets now stands on a hard, slip-resistant floor that mops in minutes, and the store reopened on schedule. The space was a showroom and back office, about 1,600 sq ft, on worn carpet tiles over an old slab, open six days a week. We recommended a two-phase install over a weekend and a Monday, showroom side first, using high-build epoxy, quartz broadcast, polyaspartic topcoat. The job came in at an estimated $8,800 to $12,400 over an estimated 3 to 5 days, and customers never walked on a wet coat.

Submittals, Sample Areas and Approvals

Submittals go to the owner or GC before a grinder starts: product data sheets, the color and texture card, the mil schedule and the cure times written per section. On larger floors we coat a sample area on the real slab, so the facility manager approves texture and grip underfoot.

Garage floor in saddle tan flake epoxy running to white cabinets and wall storage, with the stem wall coated to match

Phasing an Install Around a Working Building

Occupied buildings are coated in sections with the work set around the business, never the other way round. Rachel's dental suite, about 1,400 sq ft off Grand Avenue in Diamond Bar, was coated Friday to Monday so no patient days were lost. Sharon's upper parking deck section in the Mission Inn district closed one section at a time while tenants kept parking on the rest of the deck. Return-to-service times decide the plan: polyaspartic topcoats typically take foot traffic in 4 to 8 hours, while 100% solids epoxy typically needs 18 to 24 hours before staff walk it.

Grinders run on industrial vacuums, as silica rules push the trade, and nearby air intakes are sealed during the coat when the data sheet asks.

Why Facility Managers Choose Riverside Epoxy Flooring Group

Facility managers choose us because the crew that surveys the slab coats it, the schedule in the bid is the one we work to, and 1,187 finished projects sit behind that promise. Our owner still reads every moisture test before a system is chosen, and every floor carries our 2-year workmanship warranty against peeling, delamination and hot-tire pickup, with the coating maker's product warranty passed through in writing.

Low view across a garage floor in a gravel-look gray, tan and brown flake blend under a crystal-clear glossy finish

Commercial Service Areas Across the Inland Empire

We bid commercial floors across a 45-mile radius of Riverside, from Sycamore Canyon and Hunter Park businesses near the 215 to the logistics buildings on Eastvale's edge. Norco shops, Diamond Bar medical suites, Claremont restaurants near the Colleges and Yorba Linda retail all sit inside that radius, and Villa Park and North Tustin owners call us for commercial property too.

Related Commercial Floor Services

Association boards and asset managers start with HOA, condo and apartment garage coatings, owners of elevated structures read parking garage and deck traffic coatings, and distribution operators plan aisle striping on our warehouse floor coating page. Homeowners will find garages, patios and shops on the Riverside epoxy floors home page.

Gray textured quartz-grip coating on a driveway apron and walk beside a black steel gate and a tidy hillside yard

Commercial Floor Coating Questions From Facility Buyers

What is the smallest commercial floor you take on?

Our smallest commercial jobs are typically one section of about 1,000 sq ft, and the largest are multi-section floors like Hector's pick and pack zone, about 3,600 sq ft, in Eastvale.

Do you bid from plans and specifications?

Yes, we bid from plans and specifications, as on Victor's assembly floor in the industrial area near the Santa Ana River, then confirm every area with a slab survey.

How is a commercial floor coating priced?

Commercial floors are priced per section of 1,000 to 2,000 sq ft, as Oscar's washdown and prep room, about 1,500 sq ft, was in Eastvale, and your written bid sets the final price.

Can you work nights and weekends?

Yes, we coat after hours and over weekends, as on the Wood Streets showroom and the Diamond Bar dental suite, so the business keeps its open hours.

How long before we can use the floor again?

Most commercial floors typically take foot traffic in 4 to 8 hours with a polyaspartic topcoat, and the cure schedule for wheels is written per section in the submittals.

Who supervises the crew on site?

A lead installer runs every crew, our estimator stays the single contact through closeout, and the same team has coated floors for 12 years.

What do we receive at closeout?

You receive the product data sheets, the maintenance instructions, our 2-year workmanship warranty in writing and the coating maker's product warranty, typically 5 to 10 years on professionally installed systems.

Do you test for moisture before coating?

Yes, every slab is tested, as Elaine's restaurant kitchen and dish area, about 1,100 sq ft, in Claremont was before its urethane cement went down.

Request a Bid for Your Commercial Floor in Riverside

Request a bid with your sector, the square footage by area, your shutdown windows and whether plans exist, and we will set up the slab survey.

Floors We Have Finished

Start to finish

From Moisture Test to the Final Walk

  1. Test and measure

    We walk the slab with you, map cracks, joints and old coatings, and take moisture readings before a system is named.

  2. The written quote

    The system, every coat and its thickness, the colors and the cure and return-to-service times arrive in writing.

  3. Grind, repair and coat

    The slab is diamond ground with dust control, cracks and joints are filled, and each coat goes down inside its recoat window.

  4. The final walk

    We walk the cured floor with you, go over the care notes and tell you when cars or equipment can come back.

Request a bid

Ready to Talk About Commercial and Industrial Floor Coatings?

Call us or send plans, square footage or a walk date, and we will set a site walk and return a written bid.

Call to Discuss Scope

Calls only, we do not receive text messages.

Call (951) 589-3246